Many modern office buildings have highly glazed facades. Their energy efficiency and indoor climate is, however, being questioned. Therefore, when a modern office building (new construction) with larger glazing areas was planned, an investigation was carried out to determine the possibilities to:
- efficiently use the increased access to daylight and thereby reduce the use of electricity for lighting and at the same time improve the visual comfort
- ensure good thermal comfort
- arrive at a reasonable total energy use, which is at the same level or preferably lower level than a traditional office building.
The work was done by a project group that supported the design team with advanced energy, indoor climate and daylight simulations. Detailed performance specifications on energy use and indoor climate were worked out. The results show that the aims can be fulfilled if the following main requirements are fulfilled:
- The glazing area should not exceed 45 % of the façade area.
- The total solar transmittance of the glazing combined with solar shading must be lower than 0.1.
- The U-value of the windows must be lower than 1.1 W/m²K.
A double skin façade was chosen. An important conclusion is that coordination and cooperation throughout the building process is absolutely necessary. The building will be finished in 2007.
- efficiently use the increased access to daylight and thereby reduce the use of electricity for lighting and at the same time improve the visual comfort
- ensure good thermal comfort
- arrive at a reasonable total energy use, which is at the same level or preferably lower level than a traditional office building.
The work was done by a project group that supported the design team with advanced energy, indoor climate and daylight simulations. Detailed performance specifications on energy use and indoor climate were worked out. The results show that the aims can be fulfilled if the following main requirements are fulfilled:
- The glazing area should not exceed 45 % of the façade area.
- The total solar transmittance of the glazing combined with solar shading must be lower than 0.1.
- The U-value of the windows must be lower than 1.1 W/m²K.
A double skin façade was chosen. An important conclusion is that coordination and cooperation throughout the building process is absolutely necessary. The building will be finished in 2007.
Avdelning/ar
Publiceringsår
2006
Språk
Engelska
Sidor
19-19
Publikation/Tidskrift/Serie
[Host publication title missing]
Volym
1
Dokumenttyp
Konferensbidrag
Förlag
Ecole Nationale des Travaux Publics de l'Etat, Lyon, France
Ämne
- Building Technologies
Nyckelord
- simulations.
- office building
- double skin façade
- glazed façade
- design
- Energy efficiency
Conference name
EPIC 2006 AIVC
Conference date
2006-11-20
Conference place
Lyon, France
Status