Recent Progress on the MAX IV 1.5 GeV Storage Ring Lattice and Optics

Publiceringsår: 2012
Språk: Engelska
Sidor: 1662-1664
Publikation/Tidskrift/Serie: Proceedings of IPAC’12
Dokumenttyp: Konferensbidrag
Förlag: IPAC 2012
Ytterligare information: Conference: Proceedings:


Construction of the MAX IV facility started in 2010 and commissioning is expected to begin in 2014. Once com- pleted, the facility will include two storage rings for the production of synchrotron radiation. The 3 GeV ring will house insertion devices for the production of x-rays, while the 1.5 GeV ring will serve UV and IR users. Recently, the lattice and optics of the 1.5 GeV storage ring have been modified as a result of detailed magnet and vacuum system design. This paper discusses the lattice and optics changes as well as their effects.



  • Physical Sciences
  • Natural Sciences


IPAC'12 (3rd International Particle Accelerator Conference)
New Orleans, LA, USA
  • ISBN: 978-3-95450-115-1

Box 117, 221 00 LUND
Telefon 046-222 00 00 (växel)
Telefax 046-222 47 20
lu [at] lu [dot] se

Fakturaadress: Box 188, 221 00 LUND
Organisationsnummer: 202100-3211
Om webbplatsen