Meny

Javascript verkar inte påslaget? - Vissa delar av Lunds universitets webbplats fungerar inte optimalt utan javascript, kontrollera din webbläsares inställningar.
Du är här

Start-up Optimization of a Combined Cycle Power Plant

Författare:
  • Elin Sällberg
  • Alexandra Lind
  • Stéphane Velut
  • Johan Åkesson (Assistant Professor)
  • Stephanie Gallardo Yances
  • Kilian Link
Publiceringsår: 2012
Språk: Engelska
Dokumenttyp: Konferensbidrag
Förlag: Modelica Association
Ytterligare information: Key=sal+12mc project=LCCC-modeling

Sammanfattning

In the electricity market of today, with increasing demand
for electricity production on short notice, the
combined cycle power plant stands high regarding fast
start-ups and efficiency. In this paper it has been
shown how the dynamic start-up procedure of a combined
cycle power plant can be optimized using JModelica.
org, proposing a way to minimize the start-up
time while maximizing the power production during
start-up. The physical models have been developed
in Modelica, adapted to suit optimization purposes
and extended to optimization problems. Constraints
keeping the lifetime consumption of critically stressed
components under control are limiting factors. The
plant models have been successfully optimized to full
load.

Disputation

Nyckelord

  • Technology and Engineering
  • Combined Cycle Power Plants Start-up Dynamic optimization Optimica Control Modelica Modeling

Övriga

9th International Modelica Conference
2012-09-03
Munich, Germany
Inpress
  • LCCC
Yes
  • LCCC

Box 117, 221 00 LUND
Telefon 046-222 00 00 (växel)
Telefax 046-222 47 20
lu [at] lu [dot] se

Fakturaadress: Box 188, 221 00 LUND
Organisationsnummer: 202100-3211
Om webbplatsen