PROGRESS OF THE COMMISSIONING OF THE TEST FEL AT MAX-lab

Författare:
Publiceringsår: 2008
Språk: Engelska
Sidor: 139-141
Publikation/Tidskrift/Serie: Proceedings of EPAC08
Dokumenttyp: Konferensbidrag

Sammanfattning

In a collaboration between MAX-lab and BESSY a test

facility for Harmonic Generation Free Electron Laser is

being constructed at MAX-lab. The setup uses the existing

MAX-lab injector together with a Ti:Sa 263 nm laser

system, used for both the gun and seeding, and an optical

klystron consisting of a modulator, a chicane and a radiator.

The different parts of the system have been installed and

commissioning started during the fall of 2007. In this paper

the progress of the commissioning of the Test FEL and our

initial results are presented.

Nyckelord

  • Physical Sciences
  • Natural Sciences

Övriga

EPAC 2008
Published

Box 117, 221 00 LUND
Telefon 046-222 00 00 (växel)
Telefax 046-222 47 20
lu [at] lu.se

Fakturaadress: Box 188, 221 00 LUND
Organisationsnummer: 202100-3211
Om webbplatsen