Concrete strategy for the Oresund Tunnel
Författare
Summary, in English
This paper gives a short review of the most requirements for the concrete to be used for the 3.510 m long immersed tunnel from Amager (outside Copenhagen Airport) to an artificial double island south of Saltholm (in the middle of Oresund). The basis for the requirements is shortly commented.
Avdelning/ar
Publiceringsår
1997
Språk
Engelska
Sidor
44-54
Publikation/Tidskrift/Serie
Betonwerk und Fertigteil-Technik / Concrete Precasting Plant and Technology
Volym
63
Issue
11
Dokumenttyp
Artikel i tidskrift
Förlag
Bauverlag GmbH
Ämne
- Materials Engineering
Status
Published
ISBN/ISSN/Övrigt
- ISSN: 0373-4331