Webbläsaren som du använder stöds inte av denna webbplats. Alla versioner av Internet Explorer stöds inte längre, av oss eller Microsoft (läs mer här: * https://www.microsoft.com/en-us/microsoft-365/windows/end-of-ie-support).

Var god och använd en modern webbläsare för att ta del av denna webbplats, som t.ex. nyaste versioner av Edge, Chrome, Firefox eller Safari osv.

Plans for the European Spallation Source Beam Physics Control Software

Författare

Summary, in English

The commissioning and operations planning for the European Spallation Source is currently being defined. It is foreseen that the ESS will begin to deliver beam on target by mid 2019, something which is urging a well structured and thought through plan both for commissioning and operations. In this paper we will discuss the plans for beam physics operational software, priorities and software services needed during the different stages of beam commissioning.

Publiceringsår

2016-06-03

Språk

Engelska

Sidor

3086-3089

Dokumenttyp

Konferensbidrag

Ämne

  • Electrical Engineering, Electronic Engineering, Information Engineering

Nyckelord

  • ESS, esss, DTL, drift, Tube, Linac, beam, dynamics, RF, radio, frequency, stabilization, post, couplers, coupler, tuner, tuners, pick, accelerating, sensitivity, tuning, tilt, pmq, permanent, quadrupole, focusing, detuning, mismatch, parameter, matched, twiss, parameters, phase, advance, cooling, stem, stems, compensation, software, emittance, growth, tune, depression, error, study, studies, position, monitor, monitors, steerers, adjust, steerer, rfq, input, alignment, angle, cavity, tank, dipole, static, dynamic, PIC-NIC, PIC-NIR, statistic, statistical, TraceWin, confidence, power, losses, lost, level, longitudinal, transverse, MEBT, medium, beta, high, average, commissioning, xal, control, software, room

Conference name

7th International Particle Accelerator Conference, IPAC 2016

Conference date

2016-05-08 - 2016-05-13

Conference place

Busan, Korea, Republic of

Status

Published