Plans for the European Spallation Source Beam Physics Control Software
Författare
Summary, in English
The commissioning and operations planning for the European Spallation Source is currently being defined. It is foreseen that the ESS will begin to deliver beam on target by mid 2019, something which is urging a well structured and thought through plan both for commissioning and operations. In this paper we will discuss the plans for beam physics operational software, priorities and software services needed during the different stages of beam commissioning.
Avdelning/ar
Publiceringsår
2016-06-03
Språk
Engelska
Sidor
3086-3089
Fulltext
- Available as PDF - 400 kB
- Download statistics
Länkar
Dokumenttyp
Konferensbidrag
Ämne
- Electrical Engineering, Electronic Engineering, Information Engineering
Nyckelord
- ESS, esss, DTL, drift, Tube, Linac, beam, dynamics, RF, radio, frequency, stabilization, post, couplers, coupler, tuner, tuners, pick, accelerating, sensitivity, tuning, tilt, pmq, permanent, quadrupole, focusing, detuning, mismatch, parameter, matched, twiss, parameters, phase, advance, cooling, stem, stems, compensation, software, emittance, growth, tune, depression, error, study, studies, position, monitor, monitors, steerers, adjust, steerer, rfq, input, alignment, angle, cavity, tank, dipole, static, dynamic, PIC-NIC, PIC-NIR, statistic, statistical, TraceWin, confidence, power, losses, lost, level, longitudinal, transverse, MEBT, medium, beta, high, average, commissioning, xal, control, software, room
Conference name
7th International Particle Accelerator Conference, IPAC 2016
Conference date
2016-05-08 - 2016-05-13
Conference place
Busan, Korea, Republic of
Status
Published