Meny

Javascript verkar inte påslaget? - Vissa delar av Lunds universitets webbplats fungerar inte optimalt utan javascript, kontrollera din webbläsares inställningar.
Du är här

Recent Progress on the MAX IV 1.5 GeV Storage Ring Lattice and Optics

Författare:
  • Simon Leemann
Publiceringsår: 2012
Språk: Engelska
Sidor: 1662-1664
Publikation/Tidskrift/Serie: Proceedings of IPAC’12
Dokumenttyp: Konferensbidrag
Förlag: IPAC 2012

Sammanfattning

Construction of the MAX IV facility started in 2010 and commissioning is expected to begin in 2014. Once com- pleted, the facility will include two storage rings for the production of synchrotron radiation. The 3 GeV ring will house insertion devices for the production of x-rays, while the 1.5 GeV ring will serve UV and IR users. Recently, the lattice and optics of the 1.5 GeV storage ring have been modified as a result of detailed magnet and vacuum system design. This paper discusses the lattice and optics changes as well as their effects.

Nyckelord

  • Physical Sciences
  • Natural Sciences

Övriga

3rd International Particle Accelerator Conference 2012, IPAC 2012
Published
  • ISBN: 978-3-95450-115-1

Box 117, 221 00 LUND
Telefon 046-222 00 00 (växel)
Telefax 046-222 47 20
lu [at] lu.se

Fakturaadress: Box 188, 221 00 LUND
Organisationsnummer: 202100-3211
Om webbplatsen