Implementation Strategy for an EBR-Solution

Författare

Summary, in English

During the last decades, the level of automation has constantly increased in all types of manufacturing processes; discrete, continuous and batch. In addition to already existing automation systems, new and/or updated ones are being introduced at many production sites, e.g., various types of MES-systems. Today, the companies’ challenge is no longer to find the relevant automation/MES system, but rather to coordinate and synchronize all the various systems that they have.



This was exactly the challenge that a pharmaceutical company was facing. The company wanted to introduce yet another automation/MES system, in this case an EBR-system (Electronic Batch Record system). Within their production site, there were several areas and process cells. Each process cell had a different set of automation and MES systems already in use, some older and some newer ones, implying that the integration effort was going to vary between the process cells. Each process cell also produced its own set of products with different volumes and volume trends, and the standard of units in the various process cells were very different.



The company was seeking an implementation strategy indicating the realtive order among the process cells for introducing the EBR system, i.e., which process cell is most suitable for an EBR-introduction?

Four selection criterias were used; product criteria, equipement criteria, economic criteria and risk criteria. By evalutaing these four criterias a suitable implementation strategy could be found. This paper presents the implementation strategy and the selection criterias along with some metrics for evaluating the benefits and/or detriments of the implementation . The complete work was performed as a master thesis project during a time period of 20 weeks, and under supervision of representatives from the company and from the university.

Publiceringsår

2009

Språk

Engelska

Dokumenttyp

Konferensbidrag

Ämne

  • Other Engineering and Technologies not elsewhere specified

Conference name

ISA Expo 2009

Conference date

2009-10-06 - 2009-10-08

Conference place

Houston, TX, United States

Status

Published

Forskningsgrupp

  • LCCC