Meny

Javascript verkar inte påslaget? - Vissa delar av Lunds universitets webbplats fungerar inte optimalt utan javascript, kontrollera din webbläsares inställningar.
Du är här

Preparing the MAX IV storage rings for timing-based experiments

Författare:
Redaktör:
  • Qun Shen
  • Christie Nelson
Publiceringsår: 2016
Språk: Engelska
Publikation/Tidskrift/Serie: AIP conference proceedings
Volym: 1741
Nummer: 1741
Dokumenttyp: Konferensbidrag
Förlag: American Institute of Physics

Sammanfattning

Time-resolved experimental techniques are increasingly abundant at storage ring facilities. Recent developments in accelerator technology and beamline instrumentation allow for simultaneous operation of high-intensity and timing-based experiments. The MAX IV facility is a state-of-the-art synchrotron light source in Lund, Sweden, that will come into operation in 2016. As many storage ring facilities are pursuing upgrade programs employing strong-focusing multibend achromats and passive harmonic cavities (HCs) in high-current operation, it is of broad interest to study the accelerator and instrumentation developments required to enable timing-based experiments at such machines. In particular, the use of hybrid filling modes combined with pulse picking by resonant excitation or pseudo single bunch has shown promising results. These methods can be combined with novel beamline instrumentation, such as choppers and instrument gating. In this paper we discuss how these techniques can be implemented and employed at MAX IV.

Nyckelord

  • Accelerator Physics and Instrumentation

Övriga

12th International Conference on Synchrotron Radiation Instrumentation (SRI 2015)
Published
  • ISBN: 978-0-7354-1398-6

Box 117, 221 00 LUND
Telefon 046-222 00 00 (växel)
Telefax 046-222 47 20
lu [at] lu [dot] se

Fakturaadress: Box 188, 221 00 LUND
Organisationsnummer: 202100-3211
Om webbplatsen